Home » Renewables
• Services
Commercial renewable energy: solar, battery storage and EV charging
Generate your own clean power and cut what your buildings spend on electricity. We design, install, commission and maintain commercial solar PV, battery storage and EV charging infrastructure for commercial, industrial and public sector sites across the UK.
at a glance
- Commercial solar can be installed with no capital outlay through a Power Purchase Agreement, where a funder owns the system and you buy the power.
- A purchased commercial solar system usually pays back in three to seven years, and faster once Annual Investment Allowance relief is applied.
- Battery storage should be sized after solar, using a full year of real generation data rather than a forecast.
- Hire purchase spreads the cost over two to seven years, and the energy savings typically exceed the monthly repayment from the first month.
- One kilowatt peak of solar needs roughly 6.5 square metres of clear, unshaded roof.
- G98 and G99 grid applications are the most common cause of delay on commercial renewable projects, so we submit them early.
What is commercial renewable energy?
Commercial renewable energy means generating electricity on your own site, usually with rooftop or ground-mounted solar panels, and using it in the building rather than buying it from a supplier. For most UK businesses it covers three linked technologies: solar PV to generate the power, battery storage to hold what you cannot use immediately, and EV charging to put it into vehicles.
The commercial case rests on a simple gap. A unit of electricity you generate and use on site displaces a unit you would have bought at your full import rate, currently somewhere between 20p and 32p for most commercial contracts. A unit you export earns a fraction of that. The whole design question is therefore how much of what you generate you can actually consume, which is why we start with your half-hourly consumption data rather than with the roof.
That also explains why buildings with heavy daytime demand see much shorter payback than buildings that run overnight. A distribution centre with chillers and forklift charging is a far better solar site than an office that empties at six, even if the office has the larger roof.
The three technologies
- Solar PV generates electricity from daylight, with no moving parts and a twenty-five year performance warranty
- Battery storage holds surplus generation for use later, shaves peak demand charges and adds resilience
- EV charging converts that generation into vehicle miles, and is increasingly expected by staff and fleet operators
Solar is almost always first. Storage and charging are sized against what the solar actually produces, which is data you do not have until it is running.
How we approach a renewable project
We model your consumption before we look at your roof. Sizing a system against available roof area rather than against demand is the most common and most expensive mistake in commercial solar, because every unit you export instead of using is worth a fraction of what it could have been.
Consumption first, roof second
We work from half-hourly meter data where you have it, and twelve months of bills where you do not. That tells us how much of the generation you would actually use, which is the number that drives payback. Only then do we look at what the roof can carry.
Honest feasibility
If the numbers do not work we say so, and we say so before you have paid for a survey. Short lease terms, roofs near end of life, heavily shaded aspects and overnight consumption profiles all kill projects, and you should hear that in week one rather than week ten.
Structural and electrical together
Roof condition, remaining life, load capacity, incoming supply capacity and switchgear condition are assessed as one exercise. Splitting them across suppliers is how projects reach installation before anyone notices the roof needs replacing.
Grid applications submitted early
G98 and G99 applications go in as soon as the design is firm enough to support them, not after everything else is agreed. Network operator response times are outside anyone’s control, so the only lever is starting early.
Three funding routes costed together
Power Purchase Agreement, hire purchase and outright purchase, presented side by side with the cost of credit stated in writing. You compare rather than commit blind.
Monitoring from day one
Live generation data with fault alerts, so underperformance is visible rather than discovered years later. Inherited systems we take over frequently turn out to have had a string offline for months.
What is included, step by step
Every project runs through the same six stages. You can stop after stage one at no cost if the numbers do not justify going further.
Stage 01
Desktop feasibility
We model the roof from aerial data and your consumption from a recent bill, and return an indicative system size, generation forecast and funding comparison within two working days. No cost, no site visit.
Stage 02
Site survey
Structural assessment of the roof, electrical survey of the incoming supply and distribution boards, shading study and access review. This is where a project either firms up or gets stopped honestly.
Stage 03
Design and grid application
System design, string layout, inverter selection and export strategy, with the G98 or G99 application submitted to your Distribution Network Operator as soon as the design supports it.
Stage 04
Funding
We take the project to Power Purchase Agreement funders and asset finance lenders and bring the offers back costed side by side, with the cost of credit shown in writing.
Stage 05
Installation and commissioning
Installation to BS 7671 by qualified engineers, scheduled around your operations, with testing, commissioning and handover documentation issued digitally.
Stage 06
Monitoring and maintenance
Live monitoring goes live at handover. Panel cleaning, inverter servicing, electrical testing and fault response run under a bespoke operation and maintenance package.
The three services in detail
Commercial solar has its own page covering funding, payback and the three ways to pay. Battery storage and EV charging are usually specified alongside it.
Commercial solar PV
Rooftop and ground-mounted solar arrays designed around your consumption profile, roof structure and budget, with clear payback modelling before you commit and three funding routes including options that need no capital at all.
Commercial solar funding and payback →
Battery storage
Store surplus generation for use after dark, shave peak demand charges, and add resilience against supply interruption. Sized against a full year of real generation data rather than a forecast, so you buy the capacity you need and no more.
Commercial battery storage →
EV charging infrastructure
Workplace and fleet charging from single units to load-managed multi-bay installations, designed around the electrical capacity you actually have rather than the capacity you would need to buy..
Workplace EV charging→
Who commercial renewables suit
Two things make a renewable project pay: a large roof and heavy daytime electricity consumption. Sites with both see the shortest payback and the strongest funder appetite.
Warehousing, logistics and cold storage
The strongest sites in the country. Very large uninterrupted roofs, refrigeration and materials handling equipment running through daylight hours, and long lease or freehold tenure. Cold storage in particular has a consumption profile that matches generation almost hour for hour.
Manufacturing and industrial estates
Heavy daytime demand from machinery, compressors and extraction, and usually enough roof to cover a meaningful share of it. Lighting and controls work frequently pays back alongside the generation.
Commercial landlords and multi-site portfolios
Landlords can install and sell power to tenants at a rate below grid, which is itself a Power Purchase Agreement viewed from the other side. Across a portfolio, one rolling programme is far cheaper to run than site-by-site procurement.
Schools, academies and public sector estates
Large roofs, daytime occupancy and genuine pressure to report on carbon. Capital is usually the obstacle, which is what makes the funded routes worth examining first.
Care homes and healthcare
Continuous demand around the clock, which lifts the share of generation used on site, and a strong case for battery storage as resilience rather than purely as saving.
Commercial renewable energy: common questions
Yes. A Power Purchase Agreement means a funder pays for, owns, insures and maintains the system, and you buy the electricity it generates at a fixed rate below your grid import price. Hire purchase is the other no-capital route, where the monthly repayment is typically covered by the energy savings and you own the system at the end of the term.
The Electricity at Work Most commercial rooftop systems bought outright pay back in three to seven years, depending on how much of the generation you use on site rather than export. Payback shortens considerably once Annual Investment Allowance relief is taken into account, because the full system cost can be set against taxable profits in the year of purchase.
Usually not. Sizing storage properly needs a full year of real generation and consumption data, which you only have once the solar is running. Installing both together often means paying for battery capacity that turns out to be the wrong size. We design the electrical infrastructure so storage can be added later without rework.
A Distribution Network Operator application is permission to connect generation to the local electricity network. Systems under 3.68kW per phase use the simpler G98 notification; anything larger needs a G99 application, which the network operator must assess. It is the single most common cause of delay on commercial renewable projects, which is why we submit it early rather than after design sign-off.
As a rough guide, one kilowatt peak of solar needs about 6.5 square metres of clear, unshaded roof. A 200 kWp system therefore needs roughly 1,300 square metres of usable roof, excluding plant, rooflights and walkways. Roof area is only half the question though: a large roof on a building that draws most of its power overnight will return far less than a smaller roof on a site running machinery all day.
Not if the roof is assessed and the mounting system is specified correctly for its construction. We check roof condition, remaining life and load capacity before design is finalised, and coordinate with the roof manufacturer or installer where a warranty is still live. If the roof has less than fifteen years of life left we will tell you at survey stage, because removing and refitting an array later is expensive.
Yes. We take on operation and maintenance for existing solar, battery and EV charging installations, including systems where the original installer is no longer trading. The first visit is usually a condition and performance review, because inherited systems frequently underperform in ways nobody has noticed.
It is exported to the grid, and you can be paid for it under the Smart Export Guarantee. Export rates are much lower than what you save by using a unit on site, which is why systems should be sized against your consumption profile rather than the size of the roof. Where the local network is constrained, an export limitation device may be required as a condition of connection.
Track record
Smartec Energy is the energy division of the Smartec Group, which has spent over a decade delivering building services projects on estates including Battersea Power Station, Burberry HQ and the University of Roehampton.
What the group brings
- Over a decade of project delivery on large, complex commercial estates
- Project management and reporting processes proven on life safety work, where failure is not an option
- Established supply chain and financial backing behind every project
- NICEIC registration covering the electrical work
The energy division is newer than the group. We would rather say that plainly than imply a solar track record we have not yet built.
Related pages
Commercial solar funding: PPA,hire purchase compared
The three ways to pay for a commercial solar system, with worked examples and tax position for each
Electrical compliance and EICR testing
Fixed wire testing, PAT testing and emergency lighting. Most renewable projects surface remedial work on the existing installation.
Commercial battery storage systems
Store the generation you cannot use as it is produced, sized from a full year of real data.
Wondering what your roof could generate?
Send your site address and a recent electricity bill. We will model your generation potential, size an indicative system and compare all three funding routes, free of charge and without a site visit.