Workplace and fleet EV charging infrastructure

Charge points designed around the electrical capacity you already have and the way vehicles actually use your site, from single units to load-managed multi-bay installations.

at a glance

What is workplace EV charging?

Workplace EV charging is a set of charge points installed on your site for staff, visitors or fleet vehicles, connected to your electrical supply and usually managed by software that controls when and how fast each vehicle charges. The engineering question is rarely which charger to buy. It is how much electrical capacity you have spare, and how to share it.

 

Most sites approach this backwards. They count parking spaces, multiply by a charger, discover the resulting load exceeds their incoming supply, and are quoted a five-figure sum for a network reinforcement. The alternative is to start from how long vehicles are actually on site.

A car parked from eight until five has nine hours of connection time. At 7kW that is more than enough to replace a typical daily commute several times over. The expensive fast charger is solving a problem that site does not have. Dwell time is the number that matters, and it is the one most quotes never ask about.

What determines the design

Answer those six and the specification writes itself. Skip them and you are buying hardware and hoping.

How we approach a charging project

We survey your electrical capacity before recommending any hardware. The cost of a charging project is dominated by groundworks, cabling and any supply upgrade, not by the chargers themselves.

Capacity survey first

We establish your maximum demand and spare capacity from meter data and a survey of the incoming supply and distribution boards. That single number determines whether load management solves the problem or a network reinforcement is genuinely required.

Load management as standard

Dynamic load management shares available capacity between active chargers and backs off when the building needs it. On many sites this is the difference between installing now and waiting a year for a network connection.

Design for the cabling, not the chargers

Trenching, ducting and containment are the expensive part and the part that is disruptive to retrofit. We specify routes and capacity for the installation you will want in five years, even when you are installing two units now.

Solar and storage integration

Where you generate on site, charging is one of the best places to put generation you would otherwise export. Where storage exists, charging can continue from stored generation after dark.

Billing and access decided early

Whether staff pay, and how, determines the back office and authentication you need. It is a policy question that has to be answered before installation, not after.

Interoperable hardware

We specify equipment supporting the Open Charge Point Protocol so you can change back-office provider without replacing the chargers. Proprietary systems are cheaper on day one and expensive to leave.

What is included, step by step

Stage 01

Requirement review

Vehicle numbers, dwell times, daily mileage and who needs to charge. This is where the number of chargers is actually decided.

Stage 02

Capacity survey

Maximum demand, spare capacity, incoming supply and distribution board condition assessed on site.

Stage 03

Design

Charger selection, load management strategy, cable routes and containment, with future expansion designed in rather than retrofitted.

Stage 04

Approvals

Any DNO notification required for the connection, plus landlord consent and planning where the installation needs it.

Stage 05

Installation and commissioning

Groundworks, cabling and installation to BS 7671, with each charge point tested, commissioned and registered to your back office.

Stage 06

Monitoring and maintenance

Fault alerting over the network, spares held for installed units, and response under a maintenance package.

Who needs workplace charging

Three groups are installing now: sites caught by Building Regulations, employers under pressure from staff, and operators electrifying a fleet where charging is not optional.

New builds and major renovations

Approved Document S applies in England to new non-residential buildings with more than ten parking spaces, requiring at least one charge point and cable routes for one in five spaces. Getting the ducting right during construction costs a fraction of retrofitting it.

Employers and commercial landlords

Charging has become an expected benefit rather than a perk, and for multi-tenant buildings it is increasingly a letting consideration. Landlords also have the billing question to solve, since the electricity is drawn from the landlord's supply.

Fleet operators

Where vehicles are owned and routes are known, charging is an operational requirement rather than a benefit. Depot charging needs designing around vehicle return times and duty cycles, and usually needs load management to avoid every vehicle drawing at once.

Car dealerships

Higher demand than most sites, mixed AC and rapid DC requirements, and a public-facing element. Frequently needs a supply upgrade, which is worth establishing early.

Sites with existing solar

Vehicles parked through the working day align well with the generation curve, which turns exported units into vehicle miles at your full import value rather than the export rate.

Workplace EV charging: common questions

Fewer than most people assume, if the chargers are load managed and vehicles dwell long enough. A car parked for eight hours does not need a fast charger to be full by morning. The right number comes from how long vehicles are on site, how far they travel between visits, and how many need charging on the same day, not from the number of parking spaces.

Often not, if the installation is load managed. Dynamic load management shares the available capacity between active chargers and backs off when the rest of the building needs it, which frequently avoids a supply upgrade costing tens of thousands. We assess your existing capacity and maximum demand before recommending anything.

7kW single-phase charging suits vehicles parked for several hours, which covers most workplace parking. 22kW three-phase suits shorter dwell times or vehicles that can accept it, and many cars cannot. Rapid DC charging from 50kW upwards suits vehicles that need to leave quickly, and costs considerably more to install because of the electrical capacity it demands.

For new buildings and major renovations in England, yes. Approved Document S of the Building Regulations requires new non-residential buildings with more than ten parking spaces to install at least one charge point and cable routes for one in five spaces. Existing buildings that are not being renovated are not currently caught, but tenants, staff and fleet policies increasingly are.

Yes, and it is one of the better uses for generation you would otherwise export. Vehicles parked through the working day line up well with the solar generation curve. Where a battery is also installed, charging can continue from stored generation after dark.

That is a policy decision rather than a technical one, and it needs settling before installation because it determines whether you need back-office software, RFID authentication and billing. Some employers absorb the cost as a benefit, some recharge at cost, some at a small margin. All three are workable; deciding late is what causes problems.

Chargers report faults over the network, so a well-configured installation tells you rather than waiting for a complaint. We hold spares for the units we install and cover fault response under a maintenance package. Interoperability matters here: hardware supporting the Open Charge Point Protocol can be moved to a different back-office provider rather than stranding you with one supplier.

Government support for workplace and fleet charging has existed in various forms and the schemes change regularly, including eligibility and the amount per socket. We confirm what is actually available at the point of quoting rather than quoting a figure that may have lapsed.

Related pages

Commercial solar funding: PPA,hire purchase compared

The three ways to pay for a commercial solar system, with worked examples and tax position for each

Electrical compliance and EICR testing

Fixed wire testing, PAT testing and emergency lighting. Most renewable projects surface remedial work on the existing installation.

Commercial battery storage systems

Store the generation you cannot use as it is produced, sized from a full year of real data.

Find out how many chargers you actually need

Tell us how many vehicles, how long they are on site and roughly how far they travel. We will tell you what your existing supply can support before anyone quotes you for hardware or a supply upgrade.

No obligation, and no site visit needed to get started.

Scroll to Top