Commercial energy consultancy and utility cost reduction
Generate your own clean power and cut what your buildings spend on electricity. We design, install, commission and maintain commercial solar PV, battery storage and EV charging infrastructure for commercial, industrial and public sector sites across the UK.
at a glance
- Commercial solar can be installed with no capital outlay through a Power Purchase Agreement, where a funder owns the system and you buy the power.
- A purchased commercial solar system usually pays back in three to seven years, and faster once Annual Investment Allowance relief is applied.
- Battery storage should be sized after solar, using a full year of real generation data rather than a forecast.
- Hire purchase spreads the cost over two to seven years, and the energy savings typically exceed the monthly repayment from the first month.
- One kilowatt peak of solar needs roughly 6.5 square metres of clear, unshaded roof.
- G98 and G99 grid applications are the most common cause of delay on commercial renewable projects, so we submit them early.
What is energy consultancy?
Energy consultancy is the review of the commercial side of your utilities rather than the equipment: what you are charged, how you buy, what you are paid for what you export, and what you are legally required to report. It sits alongside efficiency work, which reduces what you consume, and generation, which changes where your power comes from.
The distinction matters because the two are often confused. An energy audit walks the building and finds the lighting left on, the compressor leaking and the controls fighting each other. An energy consultancy review never leaves the office: it reads your bills, your half-hourly data and your contracts, and finds the standing charge set for a capacity you no longer need, the export tariff nobody has looked at since commissioning, and the drainage charge on rainwater that soaks away on site.
Both find money. The consultancy side tends to find it faster, because there is nothing to install and no disruption to plan around. It is also the side most often skipped, because there is no equipment to point at and no contractor knocking on the door offering to do it.
Where the two differ
- Efficiency work reduces the units you consume, through lighting, controls, plant and monitoring
- Generation changes where units come from, through solar, storage and export
- Consultancy reduces what each remaining unit costs you, and what you are charged regardless of units
A site that has done all three is in a considerably better position than one that has done only the visible one. See energy efficiency.
What we review
Agreed capacity (kVA) and TCR banding
What reviews commonly find
Sites carrying agreed capacity they stopped needing years ago
Worth knowing
Reductions must be genuine and evidenced, and the network operator may only apply a change from the next available window.
Export agreements and generation income
Any site with generation will sometimes produce more than it can use: weekends, shutdowns, bank holidays, sunny mornings before a factory warms up. That surplus goes to the grid and someone should be paying you for it. The rate is not set by government and is not the same everywhere, because every supplier picks its own number.
Business rates under the Smart Export Guarantee commonly sit anywhere between roughly 3p and 15p per kWh depending on supplier and conditions, and many export tariffs are variable, meaning the rate can be reduced at short notice. Most businesses signed whatever their existing supplier put in front of them on the day the system was commissioned and have never looked at it since. We have seen sites exporting significant volumes and receiving nothing at all for it.
For larger generators it is worth assessing whether a negotiated export power purchase agreement beats the standard route. Those are not off the shelf and carry more contractual and metering setup, so they suit bigger volumes.
What reviews commonly find
Poor export rates, variable tariffs cut without notice, and generation exported for no payment at all
Worth knowing
This applies to systems you own or finance. Where solar is funded by a third-party PPA the export entitlement normally sits with the asset owner rather than with you, so there is nothing here to improve.
Export agreements and generation income
Any site with generation will sometimes produce more than it can use: weekends, shutdowns, bank holidays, sunny mornings before a factory warms up. That surplus goes to the grid and someone should be paying you for it. The rate is not set by government and is not the same everywhere, because every supplier picks its own number.
Business rates under the Smart Export Guarantee commonly sit anywhere between roughly 3p and 15p per kWh depending on supplier and conditions, and many export tariffs are variable, meaning the rate can be reduced at short notice. Most businesses signed whatever their existing supplier put in front of them on the day the system was commissioned and have never looked at it since. We have seen sites exporting significant volumes and receiving nothing at all for it.
For larger generators it is worth assessing whether a negotiated export power purchase agreement beats the standard route. Those are not off the shelf and carry more contractual and metering setup, so they suit bigger volumes.
What reviews commonly find
Poor export rates, variable tariffs cut without notice, and generation exported for no payment at all
Worth knowing
This applies to systems you own or finance. Where solar is funded by a third-party PPA the export entitlement normally sits with the asset owner rather than with you, so there is nothing here to improve.
Licence Exempt Supply
Certain government levies, including those funding Contracts for Difference, the Capacity Market and the Renewables Obligation, are collected by licensed electricity suppliers and passed through in your bill. A long-standing exemption in law allows a small generator to supply a business directly without a full supply licence, and those levies do not apply to the volume matched that way.
The exemption sat largely unused for years because the industry settlement system could not process it. An industry code change in 2025 resolved that, which is why Licence Exempt Supply has become a live conversation rather than a theoretical one. Market commentary puts the value somewhere in the region of £8 to £25 per MWh on matched volumes.
It is genuinely technical and it does not suit every site, because it needs the right relationship between a generator and a consumer. Treat the figures above as indicative market commentary rather than a quotation. We will tell you whether your site is a candidate; we will not promise you the outcome before looking.
What reviews commonly find
Sites with on-site or nearby generation that have never had the exemption assessed
Worth knowing
Indicative values only. Whether LES works depends on the generator and consumer relationship, and it is not available to every site.
Battery and generation optimisation
A battery installed and left on its default settings will do something useful. A battery told when to charge and when to discharge, based on your generation, your demand pattern and the cost of grid electricity at each half hour, does considerably more.
Optimisation means reviewing those control decisions against the actual data rather than the assumptions made at installation, and revisiting them when tariffs, occupancy or generation change. Where a site has both generation and storage, the two should be looked at together with the supply contract rather than as three separate things owned by three different people.
What reviews commonly find
Batteries running on installation defaults years after the site’s demand pattern changed
Worth knowing
Optimisation needs half-hourly generation and consumption data. Without it, any strategy is guesswork.
Water and surface water drainage
Your wastewater bill includes a charge for rainwater falling on your roof, yard and car park draining into the public sewer. Water companies apply this charge largely by default, based on estimates of your site area. If your rainwater soaks away on site, runs into a watercourse or otherwise never enters a public sewer, you should not be paying it, and where that is the case the charge can be removed and past overpayments reclaimed, often backdated several years.
Site area estimates can also simply be wrong, putting a site in a more expensive band than it belongs in. Separately, business water in England has been open to competition since 2017, so you can change water retailer much as you change electricity supplier. Nothing physical changes, only the billing and service arrangement, and most businesses have never switched.
One thing worth being straight about: Ofwat is explicit that you do not need a third party to claim a drainage rebate. You can apply to your water company directly. The reason it is worth having someone look is simply that most businesses never notice the charge, never check the drainage and never chase the backdate.
What reviews commonly find
Surface water drainage charged on sites where the rain never reaches a sewer
Worth knowing
You can claim a drainage rebate yourself. We include it because it is routinely missed, not because it requires us.
ESOS and SECR compliance
The Energy Savings Opportunity Scheme is a compulsory energy audit every four years for large organisations, administered by the Environment Agency. You qualify with 250 or more UK employees, or turnover of £44m or more together with a balance sheet of £38m or more. Qualification is decided by your position on a single date, and the compliance notification falls due the following year. Penalties for a missed audit run to £50,000 plus a daily rate, and non-compliance is published.
Streamlined Energy and Carbon Reporting is an annual energy and carbon disclosure inside your directors’ report, applying if you meet two of three tests: 250 or more employees, £36m or more turnover, £18m or more balance sheet. There is an exemption for very low consumption.
The non-obvious point worth knowing is that Companies Act size thresholds were raised in 2025 while the SECR thresholds were not. A company reclassified from large to medium for accounts purposes can still be fully in SECR scope on the older test, and may believe it is exempt when it is not. Deadlines and thresholds move, so confirm the current position rather than relying on what applied last time.
What reviews commonly find
Businesses in SECR scope who believe they were exempted by the 2025 accounts threshold change
Worth knowing
Group structures are where this gets messy, because subsidiaries and joint ventures carry their own obligations.
What these reviews typically uncover
Illustrative examples of the scale of opportunity these reviews find on commercial sites. They are not Smartec Energy project results and they are not a guarantee. Every site differs, which is why the assessment quantifies the opportunity against your own consumption and contracts before anyone commits to anything.
Agreed capacity across a care group
A detailed assessment of kVA requirements across a multi-site care group identified capacity that could be released, reducing capacity-related charges by roughly £11,000 a year. Reviewing the network charging band at the same time surfaced further reductions in standing charges, which is why the two are worth looking at together rather than separately.
Export income at a manufacturing site
A manufacturing business with an existing generation system was exporting electricity and receiving nothing for it. Putting an appropriate export agreement in place produced income in the region of £8,000 a month, around £96,000 a year. Sites receiving a poor export rate, or no payment at all, are more common than most people expect.
Supply structure and battery at a feed producer
Looking at the wider energy strategy rather than the supply contract alone, a Licence Exempt Supply arrangement was introduced alongside optimisation of when the site’s battery charged and discharged against generation, demand and grid costs. The combined effect was worth over £180,000 a year at that site.
Why the range is so wide
These are large numbers and they are not typical of every site. What they show is that the opportunity depends almost entirely on scale, existing arrangements and how long it has been since anyone looked. A single-site business with a recent contract and no generation may find very little. A multi-site group with generation and a contract nobody has reviewed since installation may find a great deal.
How an assessment works
Desk-based, no site visit, and no cost to establish whether there is anything worth pursuing.
Stage 01
Bills and data
Twelve months of electricity and water bills, half-hourly consumption data where your meter provides it, and details of any generation or storage on site.
Stage 02
Desk assessment
Capacity against actual maximum demand, charging band, export arrangement, contract structure, water and drainage position, and reporting obligations.
Stage 03
Quantified findings
A list of what has been found, what each item is worth against your own numbers, and how confident we are in each figure. Items that do not apply are marked as such.
Stage 04
You decide
Take all of it, some of it or none of it. Nothing proceeds without your instruction, and the assessment costs nothing whether you act on it or not.
Stage 05
Implementation
Applications to the network operator, export agreements, contract work, rebate claims and reporting handled on your behalf.
Stage 06
Review
Positions revisited as tariffs, occupancy, generation and regulation change, because none of these settle permanently.
Who this suits
The opportunity scales with size, with how much has changed since anyone last looked, and with whether there is generation on site.
Sites that have installed generation
The clearest case. Installing solar changes your load shape, creates an export position and frequently leaves you paying for grid capacity you no longer need. Almost none of that adjusts itself, and the standing charge in particular will sit unchanged until someone applies to change it.
Multi-site groups and portfolios
The same errors repeated across every site, which is what turns a modest per-site saving into a material one. Care groups, retail chains, hospitality estates and industrial groups are where these reviews find most.
Large organisations with reporting obligations
Anyone caught by ESOS or SECR has to produce the data anyway. Having the compliance work and the cost review done together means the audit produces actions rather than a filed document nobody reads.
Businesses that have not reviewed in three years or more
Contracts, charging bands, export rates and water arrangements all drift. If nobody has looked since before your last contract renewal, there is usually something.
Sites with batteries running on default settings
Storage installed and never revisited is common. Demand patterns change, tariffs change, and the control strategy set at commissioning rarely gets updated to match.
Commercial renewable energy: common questions
A review of the commercial and contractual side of your energy and water rather than the equipment. It covers your agreed capacity and network charging band, your export arrangements, how and when you buy electricity, your water and drainage charges, and whether you are caught by mandatory energy reporting. The output is a list of where money is being left on the table, quantified against your own bills.
Because the standing charge is driven by your agreed capacity in kVA and your network charging band, not by how many units you consume. Solar reduces the units. It does not reduce the width of the connection you are paying to keep available. Capturing that saving takes a separate review and a formal application to your network operator to reduce the agreed capacity.
Compare it against the market. Business rates under the Smart Export Guarantee commonly sit between roughly 3p and 15p per kWh depending on supplier and conditions, and many are variable so they can be reduced at short notice. If you have never reviewed the rate since the system was commissioned, it is worth ten minutes to check which end of that range you are on.
Most of it does. Agreed capacity, network charging bands, procurement, water and compliance all apply regardless of who owns the generation. Export agreements are the exception: under a Power Purchase Agreement the export entitlement normally sits with the asset owner rather than with you, so there is usually nothing there for you to improve.
Yes. Ofwat is explicit that you do not need a third party to claim a surface water drainage rebate, and you can apply to your water company directly. The reason it appears on this list is that most businesses never notice the charge in the first place, never check whether their drainage actually reaches a sewer, and never chase the backdated element.
It is a long-standing legal exemption that lets a small generator supply a business directly without a full supply licence, which means certain government levies do not apply to the volume matched that way. An industry code change in 2025 made it practical to settle, which is why it has become a live option. It is technical and it does not suit every site, so it is worth having assessed rather than assumed.
The initial assessment costs nothing. We look at your bills, your consumption data and your existing arrangements and tell you where there is a genuine opportunity and roughly what it is worth. You decide from there whether to take any of it further.
No, and the two work well together. An energy audit looks at the building and its equipment to find where energy is wasted. An energy consultancy review looks at the contracts, charges and arrangements around that consumption. One reduces what you use; the other reduces what you pay for what you use.
How we work on this
- The initial assessment is free and desk-based, with no site visit required
- Items that do not apply to your site are marked as not applying
- Reviewed alongside compliance, efficiency and generation rather than in isolation
- Findings are quantified against your own bills, not against averages
- You are told where you could do something yourself, including the water rebate
Part of the Smartec Group, which has delivered building services on large commercial estates for over a decade.
Related pages
Commercial solar funding: PPA,hire purchase compared
The three ways to pay for a commercial solar system, with worked examples and tax position for each
Electrical compliance and EICR testing
Fixed wire testing, PAT testing and emergency lighting. Most renewable projects surface remedial work on the existing installation.
Commercial battery storage systems
Store the generation you cannot use as it is produced, sized from a full year of real data.
Find out what your site is leaving on the table
Send twelve months of electricity and water bills and details of any generation on site. The assessment is free, desk-based and needs no site visit, and you get a quantified list rather than a sales call.
No obligation, and no site visit needed to get started.