Home » Electrical Compliance
• Services
Electrical compliance and EICR testing
Fixed wire testing, PAT testing, emergency lighting and thermal imaging for commercial, industrial and public sector estates: with prioritised reporting, remedials by the same team, and renewal dates you never have to chase.
%s registered. Nationwide delivery from our Kent head office, with all works carried out to BS 7671 by qualified engineers.
• Why it matters
The duty is continuous.
The certificate is just evidence.
Regulation 4(2) of the Electricity at Work Regulations 1989 requires electrical systems to be maintained, so far as is reasonably practicable, to prevent danger. It does not name a document or an interval. Periodic inspection and testing is simply how you demonstrate you have met that duty, which is why insurers, auditors, funders and incoming tenants all ask for a current report.
1989
Electricity at Work Regulations. The duty to maintain sits with the duty holder, not the contractor.
BS 7671
The wiring standard your installation is inspected and tested against.
5 yrs
Maximum interval for most commercial premises, or on change of occupancy.
C1
Danger present. Made safe before we leave site, every time.
• Testing intervals
How often does your building need testing?
Maximum intervals between condition reports, based on IET guidance to BS 7671. These are ceilings rather than targets: an inspector can and should shorten them where the installation’s age, condition, environment or use justifies it.
| Premises type | Maximum interval | Notes |
|---|---|---|
| Offices, shops and commercial premises | 5 years | Or on change of occupancy |
| Industrial units and manufacturing | 3 years | Harsher environments, heavier loads |
| Warehousing and distribution | 5 years | 3 years where plant or MHE load is heavy |
| Schools, colleges and academies | 5 years | Annual visual inspection alongside |
| Healthcare and care homes | 5 years | Some clinical areas annually |
| Places of public entertainment | 3 years | Includes leisure complexes |
| Swimming pools and laundrettes | 1 year | Wet environments |
| Petrol filling stations | 1 year | Hazardous area classification applies |
| Construction sites | 3 months | Temporary installations |
| Agricultural and horticultural | 3 years | Including packhouses and glasshouses |
| Private rented residential | 5 years | Statutory under the 2020 Regulations (England) |
| Emergency lighting and fire systems | Annually | Plus monthly functional testing |
Intervals are guidance, not statute, with the exception of private rented residential property in England where five-yearly inspection is a legal requirement under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020. If you are unsure which applies to your estate, send us your last report and we will map it.
• What's included
Compliance services
Everything you need to meet your duties and keep insurers, auditors and occupants satisfied. Three of these have their own pages with fuller detail.
Fixed wire testing (EICR)
Periodic inspection and testing of your fixed installation, with an Electrical Installation Condition Report that prioritises observations by code rather than listing them flat.
EICR and fixed wire testing →
PAT testing
In-service inspection and testing of portable appliances on a risk-based frequency, with full asset registers and site-by-site certification.
PAT testing programmes →
Emergency lighting testing
Monthly functional and annual full-duration testing to BS 5266, with logbook management and lamp or luminaire remedials handled in the same visit.
Emergency lighting testing →
Thermal imaging surveys
Non-invasive thermographic surveys of distribution boards, switchgear and busbars under load, catching overheating connections before they become failures or fires. No statutory requirement, but many insurers now ask for one annually and it is the cheapest way to find a fault that routine inspection cannot see.
Remedial works
C1 and C2 observations fixed by the team that found them, quoted against the report line by line so you can see exactly what you are approving. C1 items are made safe on the day of the inspection, before anyone leaves site.
Landlord and insurance certification
All certificates and reports delivered digitally and retained for your audit trail, formatted for the parties who actually ask for them: insurers, managing agents, incoming tenants and funders, with renewal reminders so nothing lapses quietly.
• Reading your report
What C1, C2, C3 and FI actually mean
The single most misread part of an EICR. A report is satisfactory only if it carries no C1, C2 or FI observations, C3 items do not fail it. Plenty of contractors code defensively, which turns a serviceable installation into an expensive one.

Danger present. Risk of injury.
Immediate remedial action required. We make safe on the day, before we leave site.

Potentially dangerous.
Urgent remedial action required. A report cannot be satisfactory while a C2 stands.

Danger present. Risk of injury.
Immediate remedial action required. We make safe on the day, before we leave site.

Potentially dangerous.
Urgent remedial action required. A report cannot be satisfactory while a C2 stands.

Improvement recommended.
Not a failure. The installation can remain in service, but the observation is worth planning in.

Further investigation required.
Something could not be fully assessed and further investigation is advised. This does not mean an unsatisfactory result.
Landlord and insurance certification
If a report comes back with a long list of C2s and a large remedial quote attached, ask the contractor to justify each code against the installation as found. Some observations that get coded C2 are genuinely C3 improvements. We are happy to review a third-party report and tell you which is which, whether or not you use us for the remedials.
• Reading your report
Compliance without the chaos
Most compliance programmes fail not because the testing is hard, but because scheduling, reporting and remedials sit with three different suppliers and nobody owns the renewal date.
- NICEIC registered, with qualified engineers working to BS 7671 on every job
- Planned rolling programmes across multi-site portfolios
- Out-of-hours and weekend testing to protect your operations
- Digital reporting with observations prioritised, not just listed
- Remedials quoted line by line against the report
- One provider for testing, remedials and ongoing maintenance
Landlord and insurance certification
Estates of ten sites or more usually save money and a great deal of governance effort by moving from site-by-site procurement to a single rolling programme.
- One renewal calendar across every property
- Consistent coding standards, so reports are comparable site to site
- Certificates in one place for audit, insurance and disposal
- Remedials batched by region to cut mobilisation cost
- A single point of contact rather than a supplier per site
Send us a property list and last known test dates and we will map the whole estate against the intervals above, free of charge, before you commit to anything.
• What happens next
From enquiry to certificate
Day 1
Scope
Send your last report, a property list or just an address. We confirm what is due, when, and what it should cost.
Week 1
Schedule
Dates agreed around your operations, including out of hours where a shutdown would be disruptive.
On site
Test
Circuit-by-circuit inspection and testing. Any C1 is made safe before we leave the building.
+3 days
Report
Digital certificate with observations coded and prioritised, plus a costed remedial schedule.
Ongoing
Renew
Renewal dates tracked and flagged ahead of expiry, so certification never lapses by accident.
• Common questions
Questions we get asked
For most offices, shops and commercial premises the maximum interval is five years, or on change of occupancy. Industrial units are typically three years, swimming pools and laundrettes annually, and construction sites every three months.
These are maximum intervals from IET guidance rather than fixed legal deadlines. The inspector can and should shorten them where the age, condition, environment or use of the installation justifies it.
The Electricity at Work Regulations 1989 require electrical systems to be maintained, so far as is reasonably practicable, to prevent danger. The Regulations do not name a document or an interval, but periodic inspection and testing is the accepted way of demonstrating you have met that duty.
In practice it becomes a requirement anyway: insurers, auditors, funders, managing agents and incoming tenants will all ask for a current report.
C1 means danger is present and immediate action is required. C2 means potentially dangerous and urgent remedial action is required. C3 is an improvement recommendation and does not fail the report. FI is advised and does not mean an unsatisfactory result.
An unsatisfactory result means at least one C1, C2 or FI observation. C1 items are made safe before we leave site, that is not optional and it is not chargeable as a separate visit.
Everything else is quoted, prioritised and scheduled with you. Once the remedials are complete the report can be reissued as satisfactory.
No. Testing is done circuit by circuit and each circuit needs only a short isolation. We agree in advance which areas can come offline and when, and work out of hours or over a weekend where the site demands it.
Data centres, cold storage and healthcare sites need more planning than most, and we scope those properly rather than turning up and hoping.
Yes, and it is usually both cheaper and far easier to govern than procuring site by site. You get one renewal calendar, consistent coding standards so reports are comparable, and remedials batched by region to cut mobilisation cost.
There is no law that says you must PAT test annually. The duty comes from the Electricity at Work Regulations 1989 and PUWER 1998 to maintain equipment in a safe condition.
The IET Code of Practice sets out a risk-based approach instead, which is why a drill on a construction site is inspected far more often than a monitor in an office. Blanket annual testing of everything is usually money wasted.
For planned programmes we book around your calendar. For an urgent EICR ahead of a sale, lease completion or insurance deadline, tell us the date you need the certificate by and we will tell you honestly whether we can meet it rather than taking the booking and hoping.
Is your next EICR due?
Send us your last report, or just a property list and your best guess at the dates. We’ll map your estate against the intervals, tell you what’s overdue, and put together a testing and remedials plan, free of charge.