• Services

EICR and fixed wire testing for commercial property

Periodic inspection and testing of your fixed electrical installation to BS 7671, with observations coded and prioritised so you can see what genuinely needs doing and what does not.

at a glance

What is an EICR?

An Electrical Installation Condition Report is the document produced by a periodic inspection and test of a building’s fixed electrical installation. It records the condition of the installation as found, lists any departure from BS 7671, and codes each observation by how serious it is. It is the evidence most commonly used to show that the duty to maintain electrical systems has been met.

The scope is the permanent installation: distribution boards, sub-mains, cabling, socket outlets, switches, lighting circuits and the connections to fixed equipment. Each circuit is inspected visually and then tested electrically, which means a short isolation per circuit rather than a whole-building shutdown.

What an EICR is not is a pass or fail on the building. It is a snapshot of condition on the day, with a recommended date for the next inspection based on what the inspector found. Two competent inspectors can reach slightly different conclusions on the same installation, which is exactly why the coding rationale matters and why it is reasonable to ask for it.

Where the energy usually goes

Anything you could unplug is PAT testing rather than fixed wire testing, and produces an appliance record rather than an EICR.

The codes, and what they should cost you

Understanding the difference between a C2 and a C3 is the single biggest lever you have on remedial spend. A report is satisfactory only if it has no C1, C2 or FI observations.

Danger present. Risk of injury.

Immediate remedial action required. We make safe on the day, before we leave site.

Potentially dangerous.

Urgent remedial action required. A report cannot be satisfactory while a C2 stands.

Improvement recommended.

Not a failure. The installation can remain in service, but the observation is worth planning in.

Further investigation required.

Something could not be fully assessed and needs investigating without delay. Also prevents a satisfactory result.

Defensive coding is a real cost

Some contractors code conservatively because a C2 is safer for them than a C3 if something later goes wrong. The result is a longer remedial quote than the installation warrants. Ask for the rationale behind each observation, and be prepared to challenge it.

We will review a third-party EICR and give you a view on the coding whether or not you use us for the remedials. It is a short conversation and on a large estate it frequently saves five figures.

When your next EICR is due

Maximum intervals from IET guidance to BS 7671. An inspector can shorten them based on the condition, age, environment and use of the installation, and the report states the recommended date for the next inspection.

Maximum recommended intervals between electrical installation condition reports by premises type
Premises typeMaximum intervalNotes
Offices, shops and commercial premises5 yearsOr on change of occupancy
Industrial units and manufacturing3 yearsHarsher environments, heavier loads
Warehousing and distribution5 years3 years where plant or MHE load is heavy
Schools, colleges and academies5 yearsAnnual visual inspection alongside
Healthcare and care homes5 yearsSome clinical areas annually
Places of public entertainment3 yearsIncludes leisure complexes
Swimming pools and laundrettes1 yearWet environments
Petrol filling stations1 yearHazardous area classification applies
Construction sites3 monthsTemporary installations
Agricultural and horticultural3 yearsIncluding packhouses and glasshouses
Private rented residential5 yearsStatutory under the 2020 Regulations (England)
Emergency lighting and fire systemsAnnuallyPlus monthly functional testing

These are guidance rather than statute, with one exception: private rented residential property in England requires five-yearly inspection by law under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020.

How we run an EICR

We quote from a circuit count and scope the isolations before we arrive. Most of the friction in fixed wire testing comes from turning up without having agreed what can be switched off and when.

Priced from circuits, not square feet

We ask for your last report or photographs of the distribution boards, because circuit count is what drives time on site. A price based on floor area is a guess, and it is usually revised upward once an engineer sees the boards.

Isolations agreed in advance

Which circuits come offline, when, and who needs telling. Data-critical, refrigerated and continuous-process areas are scoped separately rather than assumed to be like the rest of the building.

Coding you can interrogate

Every observation carries a reason, not just a code. If you want to challenge a C2 you should be able to, and we would rather have that conversation than issue a report nobody understands.

C1 made safe before we leave

Danger present means danger removed the same day. It is not quoted, scheduled or left with a warning label, and it is not a separate visit.

Remedials quoted against the report line by line

So you can see exactly what you are approving and in what order, and can defer C3 items honestly rather than being sold the whole list as though it were mandatory.

Multi-site programmes on one calendar

Consistent coding standards across an estate so reports are genuinely comparable site to site, with renewal dates tracked centrally and remedials batched by region.

Who needs an EICR

Any organisation in control of a commercial building has a duty to maintain the electrical installation. What varies is the interval, who holds the duty, and who else will ask to see the report.

Commercial landlords and managing agents

Duty for common parts and the fabric of the installation usually sits with the landlord, with tenants responsible for what they have installed. Getting that split written down before commissioning a report avoids a great deal of argument later.

Buyers, sellers and funders

An EICR is routinely requested during due diligence, and an unsatisfactory one becomes a price negotiation. If a transaction is coming, it is worth knowing what the report will say before the other side does.

Industrial and manufacturing sites

Three-yearly intervals, harsher environments and installations that have been extended repeatedly over decades. These are the reports where circuit counts and limitations matter most.

Schools, healthcare and public sector

Five-yearly for most areas with some clinical spaces annually, and testing that has to be planned tightly around occupancy. Holiday periods make school programmes straightforward if booked early enough.

Anyone whose insurer has asked

Insurers increasingly ask for a current satisfactory EICR, and some now ask for thermal imaging alongside it. A lapsed report is a poor position to be in at renewal or, worse, at claim.

EICR and fixed wire testing: common questions

Fixed wire testing is the periodic inspection and testing of the permanent electrical installation in a building: distribution boards, sub-mains, cabling, socket outlets, switches, lighting circuits and fixed equipment connections. The output is an Electrical Installation Condition Report, or EICR. Anything with a plug on it falls under PAT testing instead.

For most offices, shops and commercial premises the maximum interval is five years, or on change of occupancy. Industrial units are typically three years, swimming pools and laundrettes annually, and construction sites every three months. These are maximum intervals from IET guidance rather than legal deadlines, and the inspector can shorten them where the age, condition, environment or use of the installation justifies it.

It depends on circuit count, not floor area. A small office of twenty circuits might take a day. A distribution centre with several hundred circuits across multiple boards can take a week or more. That is why we ask for your last report or photographs of the boards before quoting, because a price based on square footage alone is a guess that gets revised upward once someone is on site.

C1 means danger is present and immediate action is required. C2 means potentially dangerous and urgent remedial action is required. C3 is an improvement recommendation and does not fail the report. FI means something needs further investigation without delay. A report is satisfactory only if it carries no C1, C2 or FI observations, so a page of C3 observations is not a failure whatever anyone tells you.

Yes. Sampling is permitted where full testing is impractical, provided the extent and any limitations are recorded clearly on the report. It is common on large estates and in continuous-process environments. What matters is that the sample is representative and the limitations are stated plainly rather than buried, because the next person to read that report will be an insurer or a buyer’s surveyor.

Usually whoever is in control of the premises, which for a leased building depends on the lease. Landlords typically hold the duty for common parts and the fabric of the installation, tenants for what they have installed themselves. It is one of the most common sources of confusion we see and worth resolving before a report is commissioned rather than after.

Less than most people expect. Each circuit needs only a short isolation, and we agree in advance which areas come offline and when. Out-of-hours and weekend working is standard for retail, healthcare, cold storage and continuous manufacturing, and data-critical areas are scoped separately rather than assumed.

It is common, and it is not always justified. Some contractors code conservatively because a C2 is safer for them than a C3 if something later goes wrong, and the result is a longer remedial quote than the installation warrants. Ask for the rationale behind each observation. We will review a third-party report and give you a view on the coding whether or not you use us for the remedials.

Why Smartec Energy

Part of the Smartec Group, which has delivered building services on large commercial estates for over a decade.

Related pages

Commercial solar funding: PPA,hire purchase compared

The three ways to pay for a commercial solar system, with worked examples and tax position for each

Electrical compliance and EICR testing

Fixed wire testing, PAT testing and emergency lighting. Most renewable projects surface remedial work on the existing installation.

Commercial battery storage systems

Store the generation you cannot use as it is produced, sized from a full year of real data.

Send us your last report

We will tell you what is due, when, and what it should cost. If the last report came back with a long remedial list, we will also give you an honest view on the coding.

No obligation, and no site visit needed to get started.

Scroll to Top