Home » Commercial Solar Panel Installation London
• Commercial solar - Kent
Commercial solar in London. Nothing off your balance sheet.
Two funding routes put a commercial solar system on your Kent building without releasing capital, with zero upfront costs. Both start cutting your electricity bill in the first billing period.
Outer London's industrial and logistics stock holds some of the best commercial solar roofs in the capital. We will tell you within two working days whether yours is one of them.
at a glance
- Commercial solar can be installed on a London site with no capital outlay through a Power Purchase Agreement.
- A purchased system usually pays back in three to seven years, and faster once Annual Investment Allowance relief is applied.
- One kilowatt peak of solar needs roughly 6.5 square metres of clear, unshaded roof.
- Hire purchase spreads the cost over two to seven years, and the savings typically exceed the monthly repayment from the first month.
- The network operator for London is UK Power Networks, operating as South Eastern Power Networks, and we submit G98 and G99 applications directly.
- Covering the City, Docklands, Park Royal, Barking, Enfield, Croydon, Greenwich and the outer boroughs.
Commercial solar across London
London’s industrial and logistics stock is where commercial solar works best in the capital. Park Royal, Barking, Enfield, Croydon and the buildings along the Thames corridor have the two things that make a project pay: large single-occupier roofs and heavy demand through the working day. Larger single-occupier buildings with long tenure elsewhere in London work on the same basis, and so do landlord-owned buildings where power can be sold on to tenants below grid rate.
London is also a more varied market than most, and it is worth knowing that before you spend money finding out. Roofs here are smaller, more overshadowed by neighbouring buildings and more cluttered with plant, lift motor rooms and rooflights than equivalent stock elsewhere, so usable area is frequently less than the footprint suggests. Multi-tenant offices are harder commercially rather than technically, because the party paying for the roof is rarely the party paying the electricity bill.
Which is why the first step costs nothing. Send a postcode and a recent bill and we will model your specific roof within two working days, before anyone visits site, and tell you plainly which category your building falls into.
Grid connections in London
Grid capacity is the single biggest risk to a London solar project, and parts of west London have been well documented as constrained. Applications go in early, and where the network requires it an export limitation becomes a condition of connection, which changes the design rather than stopping it.
- Network operator: UK Power Networks, operating as South Eastern Power Networks
- G98 notification for smaller systems, G99 application for larger
- Submitted as soon as the design supports it, not after sign-off
- Export limitation negotiated where the network requires it
Grid applications are the most common cause of delay on commercial solar projects anywhere in the UK. Starting early is the only real lever.
• Why this matters now
You don't set your electricity price. With solar on the roof, you do.
Every contract renewal is a negotiation you can’t really win. Your rate is decided by wholesale markets, network charges and levies, none of which you control, and the only variable you get to choose is how long you fix for. Generating on site changes that relationship. The electricity your own roof produces has a price agreed in advance, and it doesn’t move because a gas market did.
£0
Capital outlay on a PPA. The funder pays for the system in full and carries the performance risk.
2–7 yrs
Typical hire purchase term, after which the generation is effectively free for two more decades.
25 %
Corporation tax relief on the full system cost in year one, if you own the asset.
• Ways to pay
Three routes to the same roof
Power Purchase Agreement
You want the savings and the price certainty without owning anything or approving any capital.
- A funding partner pays for, owns, insures and maintains the whole system
- You buy the electricity it generates at a fixed pence-per-kWh rate, well below grid
- Bills fall in the first billing period, with no capital case to write
- Rate agreed for the term and indexed at a small fixed percentage
- Sits off balance sheet as a supply contract rather than a lease
- At the end of the term the asset can be purchased at a nominal fee
Hire purchase
You want to own the system and use the tax relief, but not take the cost out of working capital in one hit.
- Little or no deposit: often just one or two payments in advance
- Fixed monthly instalments over two to seven years
- Structured so bill savings and export income exceed the repayment from month one
- HMRC treats it as an outright purchase, so the AIA stays with you
- After the term, generation is effectively free for the rest of the panels' life
Outright purchase
You have capital sitting idle and want the best return of the three over twenty-five years.
- No cost of credit, so every generated unit is worth its full value to you
- Annual Investment Allowance relief on the full cost in year one
- Shortest payback of the three routes
- All Smart Export Guarantee income is yours
- Maintenance sits with you, or with us under a service contract
| Power Purchase Agreement | Hire purchase | Outright purchase | |
|---|---|---|---|
| Upfront cost | None | Nil to small deposit | Full system cost |
| Who owns the system | The funder, for the term | You: title passes at the end | You, from day one |
| Who maintains it | The funder, included | You, or Smartec under contract | You, or Smartec under contract |
| Capital allowances | Claimed by the funder | Yours: treated as an outright purchase | Yours |
| Export income (SEG) | Kept by the funder | Yours | Yours |
| Balance sheet | Off: it's a supply contract | On: asset and liability recognised | On: asset only |
| Effect on year-one cash | Positive immediately | Positive if structured well | Negative until payback |
| Typical term | 15 to 25 years | 2 to 7 years | N/A: asset life 25 years+ |
| Lifetime saving | Good, with no risk exposure | High once the term ends | Highest |
| Suits you if | Capital is hard to get and you want zero involvement | You're profitable and want ownership on a monthly budget | You have cash and a long tenure in the building |
• Route 01 in detail
The Power Purchase Agreement
The route most businesses ask about and the one most often misunderstood. In plain terms: somebody else buys the solar system, puts it on your roof, and sells you the electricity it makes at a price you agree in advance.

We survey the site and design the system
Roof condition, structural capacity, half-hourly consumption and grid connection all get assessed before anything is proposed. The system is sized against what you actually use, because on a PPA the units you don't consume are worth far less.

We survey the site and design the system
Roof condition, structural capacity, half-hourly consumption and grid connection all get assessed before anything is proposed. The system is sized against what you actually use, because on a PPA the units you don't consume are worth far less.

A funding partner buys it outright
We take your site to funders and bring the offers back to you. The funder pays for the equipment and the installation in full. Nothing appears in your capital budget and nothing goes on your balance sheet.

You buy the electricity it generates
You sign an agreement to buy the power produced on your roof at a fixed pence-per-kWh rate below your grid import price. Most agreements index that rate by a small fixed percentage a year, so you know your price in year twelve on the day you sign.

The funder keeps it running for the term
Insurance, monitoring, servicing, inverter replacement and repairs all sit with the asset owner for the length of the agreement. We manage the works, so you deal with us rather than chasing the funder.
A PPA is usually the right call when
- Capital expenditure is difficult to approve, or is already committed elsewhere
- You have a long lease or freehold and heavy daytime electricity consumption
- Price certainty matters more to you than owning another asset
- You want the net zero and ESG reporting benefit without taking project risk
- Your business pays little corporation tax, so the allowances would be wasted on you anyway
- Your roof is structurally sound with fifteen or more years of life left
Funder appetite depends on covenant strength, site tenure and system size, and most funders look for sites consuming upwards of 250,000 kWh a year. We confirm what's realistic before anyone spends time on paperwork.
Where the saving comes from
Illustrative rates for a 200 kWp rooftop system. On around 150,000 kWh consumed on site, that gap is roughly £15,000 in year one: and it usually widens, because the PPA rate is indexed at a fixed percentage while grid prices are not. Actual rates depend on site, size, funder and covenant strength.
200 kWp on a distribution unit, PPA funded
A worked example to show the shape of the numbers. Yours will differ.
Illustrative only, not a quotation. Assumes a UK rooftop installation at typical yield with no shading or structural constraints.
• Route 01 in detail
Hire purchase: own it, and keep the tax relief
The route most profitable UK businesses land on. You put in little or nothing, pay fixed monthly instalments, and own the system at the end. The part people miss is that HMRC treats it as an outright purchase from day one, which is what makes it worth considerably more than a PPA to a company with taxable profits.
The same 200 kWp system, on hire purchase
Same roof, same panels, different funding. This is why the route is worth a look.
Illustrative only, not a quotation or an offer of finance. The system earns and saves around £3,000 a month while the repayment is around £2,460, so the project is cash-flow positive from month one before any tax is counted. On top of that, the full cost is claimed as a special-rate capital allowance in the year the system is switched on. Rates, terms and lender appetite vary; tax treatment depends on your circumstances and we confirm it with your accountant before anything is signed.
At a glance
- Typical term
- Two to seven years
- Deposit
- Nil to 20%: often just one or two payments in advance
- Project value
- Around £30,000 upwards
- Ownership
- Yours in substance from day one; title transfers at the end for a nominal fee
- Capital allowances
- You claim them: the transaction is treated as a cash purchase
- Export income
- Smart Export Guarantee payments are yours
- Balance sheet
- On: the asset and the outstanding liability are both recognised
- VAT
- Payable up front on the equipment and reclaimable as normal; the interest element is exempt
- Best for
- Profitable businesses that want to own the system and can use the relief
Why the tax relief stays with you
- Acquire plant and machinery on hire purchase and HMRC treats it as though you had bought it outright for cash
- The claim is on the full capital cost of equipment and installation, not apportioned across the instalments
- Relief falls in the accounting period the expenditure is incurred: commission the array in March and the whole claim normally lands in that period, even with years of payments left to run
- The interest is handled separately as an ordinary business expense against profits, rather than through the capital allowances pool
Under a PPA the funder owns the system and banks that relief instead. Under a finance or operating lease the lessor usually claims it and is expected to price the benefit back through lower rentals. If you can use the relief yourself, keeping it is almost always worth more than having somebody discount it back to you second-hand.
One point that's routinely got wrong
Solar PV is special-rate expenditure, which puts it on the Annual Investment Allowance route. It does not qualify for 100% full expensing, which covers main-rate plant only.
If a competing quote is built on full expensing for a rooftop array, the classification is wrong and so is the payback figure attached to it. Worth checking before you compare proposals side by side.
When hire purchase is not the right answer
If your business pays little or no corporation tax: a charity, a not-for-profit, a public body, or a company still carrying losses: then the biggest single advantage of hire purchase is worth nothing to you, and you'd be paying interest to own an asset whose tax value you can't use.
In that situation the funder is usually the better home for the allowances, and a PPA or a lease will normally beat hire purchase on lifetime cost. Model the routes against each other rather than taking the ownership route by default because it's the familiar one.
• Route 03 in detail
Outright purchase
If the cash is available and you’re staying in the building, buying the system outright returns more than anything else over twenty-five years. There’s no cost of credit, every generated unit is worth its full value to you, and the Annual Investment Allowance takes roughly a quarter off the effective price in year one.
It’s the benchmark every financed route gets measured against. We show you this number alongside the others even when we expect you to choose differently, because you can’t judge the cost of finance without it.
Worth doing if
- You have capital with no better return available elsewhere in the business
- You're profitable enough to absorb the full allowance in the year of spend
- You own the freehold, or hold a lease long enough to see the payback through
- You'd rather hold an appreciating asset than a long-term supply contract
Spend more than £1m on qualifying plant in a year and the AIA covers the first £1m, with the balance attracting a 50% first-year allowance and the remainder entering the special rate pool. Worth planning the timing of a large project around your year end.
• Scope of works
Everything between the enquiry and the first generated unit
Feasibility, design, grid applications, installation and aftercare are all managed by us from a single point of contact, whichever way the project is funded.
Feasibility and yield modelling
Half-hourly consumption analysis, shading study and generation forecast, so the system is sized to what you actually use rather than to what fits on the roof.
Structural assessment
Roof condition, remaining life and load capacity checked before the design is finalised. If the roof needs work first, we’ll tell you at survey stage.
Funding and finance structuring
We take the project to PPA funders and asset finance lenders, then bring the offers back costed side by side with the cost of credit shown in writing.
DNO and grid applications
G98 and G99 submissions, network operator liaison and export limitation where needed: managed early so approval doesn’t stall the project.
Installation and commissioning
Installation to BS 7671 by qualified engineers, scheduled around your operations and out of hours where the site demands it.
Monitoring and maintenance
Live generation data with fault alerts, plus panel cleaning, inverter servicing and electrical testing under a bespoke O&M package.
• What happens next
From enquiry to energised
Most commercial projects run to roughly this shape. You’ll get dated milestones once the survey is done.
Within 2 days
Desktop review
Send a bill and your address. We model the roof from aerial data and come back with an indicative size and saving.
Week 1–2
Site survey
Structural, electrical and access assessment on site, plus a look at your distribution board and metering.
Week 2–4
Proposal and funding
A designed system with all three funding routes costed side by side, so the decision is a comparison rather than a leap.
Week 4–12
Approvals
DNO application, finance or PPA documentation, planning where required, and scheduling around your calendar.
2–6 weeks on site
Install and energise
Installation, testing, commissioning and handover, then monitoring goes live and the savings start.
Where commercial solar works hardest in London
Large roofs and heavy daytime consumption are the two things that make the numbers work: and heavy daytime consumption is exactly what a PPA funder looks for. These sectors tend to have both.
Industrial estates and logistics
Park Royal, Barking, Enfield and the Thames corridor hold London’s best commercial solar stock: larger roofs, single occupiers and demand through the working day. These are where London projects most often stack up.
Commercial landlords and managing agents
London’s defining commercial solar problem is the landlord and tenant split, because whoever funds the roof is rarely whoever pays for the electricity. A landlord-owned system selling power to tenants below grid rate resolves it, and is itself a Power Purchase Agreement viewed from the other side.
Data and communications facilities
Very high consumption and a strong case on paper, but usually constrained by both roof area and grid capacity. Worth modelling properly rather than assuming, because the consumption profile is close to ideal even when the roof is not.
Hotels, leisure and hospitality
Continuous demand, plant-heavy roofs and frequently a conservation area or listed building constraint. These projects live or die on the survey rather than the spreadsheet.
Boroughs, schools and NHS estates
Large London public estates with genuine carbon reporting pressure and very limited capital, which makes the funded routes the practical starting point.
• Credentials
New division, a decade of delivery behind it
Smartec Energy is the energy arm of the Smartec Group, which has spent over a decade delivering large-scale building services projects for commercial, industrial and public sector clients. The division is new; the project management, the delivery processes, the supply chain and the financial backing behind it are not. We work nationwide.
Questions we get asked before
anyone signs anything
There’s no catch, but there is a trade. You pay nothing to have the system installed and nothing to maintain it, and your rate for the solar electricity is below your grid import price from day one. In exchange, the funder owns the asset, claims the capital allowances, keeps the export income, and takes the margin between the generation cost and what you pay for the length of the agreement.
Over twenty-five years you’ll save less than you would by buying the system outright. What you’re buying is certainty and the absence of a capital request.
Because the payments are designed to be smaller than the savings. On a well-structured deal the electricity you stop buying, plus the export income from what you don’t use, comes to more than the monthly instalment: so the project pays for itself out of your existing energy budget rather than out of new money.
The deposit is typically nil or one or two payments in advance. In practice you’re swapping a variable energy bill for a fixed repayment that ends after a few years, while the panels keep generating for another two decades.
In practice it becomes a requirement anyway: insurers, auditors, funders, managing agents and incoming tenants will all ask for a current report.
Three questions decide it. Do you want to own the asset? Can your business use the capital allowances? And do you have capital available, or is that the blocker?
If you’re profitable and want ownership, hire purchase is usually the answer. If capital approval is the obstacle and you’d rather not own anything, a PPA is. If you have cash sitting idle and a long tenure in the building, buy it outright. We model all three from your numbers and show you the comparison rather than steering you.
Hire purchase and outright purchase work from around £30,000 upwards, which is roughly a 40 kWp system. PPAs need to be bigger: most funders want a site consuming upwards of 250,000 kWh a year, because they’re taking a twenty-five year position and need the volume to make it work.
Roof area is only half of it. A large roof on a building that draws most of its power overnight will return far less than a smaller roof on a site running machinery all day.
Everything else is quoted, prioritised and scheduled with you. Once the remedials are complete the report can be reissued as satisfactory.
Often yes, but the remaining term matters. PPAs generally need fifteen or more years of tenure, so a short lease usually rules that route out. Hire purchase or outright purchase can still work on a shorter lease if the payback lands comfortably inside your term, and you’ll need your landlord’s consent either way.
We also work with commercial landlords who want to install and pass a reduced rate to their tenants: that arrangement is itself a PPA, just from the other side of the table.
The AIA lets most businesses deduct the full cost of qualifying plant and machinery against taxable profits in the year the expenditure is incurred, up to £1m a year. At the 25% main rate of corporation tax, a £150,000 system reduces your tax bill by around £37,500, bringing the effective cost down to roughly £112,500 and shortening payback accordingly.
It’s available on outright purchase and on hire purchase, because HMRC treats hire purchase as a cash purchase. It isn’t available on a PPA, where the funder claims it instead. Above the £1m limit, special-rate spend attracts a 50% first-year allowance with the balance entering the special rate pool. Allowances and thresholds change: confirm the position with your accountant.
Yes. You can request a settlement figure at any point and clear the balance ahead of schedule, which is useful if you come into cash, refinance, or sell the business. The figure is broadly the outstanding capital plus interest accrued to that date, so settling early usually saves you the interest that hasn’t yet fallen due rather than triggering a penalty.
Exactly how the rebate is calculated depends on the agreement, so ask for the figure in writing before deciding, and check whether the small option-to-purchase fee is still payable to transfer title.
The IET Code of Practice sets out a risk-based approach instead, which is why a drill on a construction site is inspected far more often than a monitor in an office. Blanket annual testing of everything is usually money wasted.
The panels are fixed to the roof, so they normally transfer with the property. A hire purchase agreement belongs to your company rather than the building, so it doesn’t disappear on completion: you either settle the outstanding balance out of the sale proceeds, or arrange for the buyer to take over the agreement with the lender’s consent.
A PPA transfers with the site and the incoming owner steps into it, which is worth disclosing early in a sale. In practice a system that’s already cheap to run and generating reads as an asset to a buyer, not a liability.
Rooftop work is largely invisible from inside the building. The disruptive parts are the electrical tie-in at your distribution board, which usually needs a short planned shutdown, and any scaffolding or crane access. Both get scheduled around you, including out of hours or over a weekend where the site demands it.
This is exactly why we assess roof condition before design. Panels have a twenty-five year life, so a roof with less than fifteen years left is a genuine problem: removing and refitting an array is expensive, and a PPA funder won’t take the position at all.
If the roof is nearing end of life we’ll tell you at survey stage. In some cases overcladding, or a roof replacement combined with the solar install, is the better project and we’ll cost it that way.
Yes, and we usually recommend that order. Install solar first, monitor a full year of real generation and consumption data, then size storage against what you actually export rather than against a forecast. We design the electrical infrastructure with that expansion in mind so the later work is straightforward.
Yes. G98 applications for smaller systems and G99 for larger ones are submitted and managed by us. It’s one of the most common causes of delay on commercial solar projects, so we start it early.
Often yes, particularly the industrial and logistics stock in outer London, which has the large single-occupier roofs and daytime demand that make a project pay. Constrained inner London roofs are harder, because smaller usable area, overshadowing, roof plant and tighter grid capacity all work against them. London varies more than anywhere else in the country, which is why we model your specific roof at desktop stage rather than generalising from the postcode.
Find out what your London roof is worth
Send a recent electricity bill and your postcode. Two working days later you will have an indicative system size, a generation forecast and all three funding routes costed side by side.
No obligation, and no site visit needed to get started.