• Commercial solar - Kent

Commercial solar in Kent. Nothing off your balance sheet.

Two funding routes put a commercial solar system on your Kent building without releasing capital, with zero upfront costs. Both start cutting your electricity bill in the first billing period.

Our head office is in Maidstone, so Kent is the county we cover most closely.

at a glance

Commercial solar across Kent

Our head office is in Maidstone, so Kent surveys are usually arranged within a few days rather than a few weeks, and remedial visits do not need a day of travel built into them.

Kent is also unusually well suited to commercial solar. The M20 and M2 corridors carry a heavy concentration of distribution and logistics property, much of it built in the last twenty years with large, uninterrupted, structurally sound roofs. Those are the buildings solar was designed for. The county’s food production and horticulture sector adds something most of the South East does not have: packhouses, glasshouses and cold stores running refrigeration through daylight hours, which is the consumption profile that produces the shortest paybacks we see.

Grid connections in Kent

Grid capacity across Kent is generally better than in London, though constraints do exist, particularly in the north of the county where connections have grown quickly. We check the position before design is finalised rather than after.

Grid applications are the most common cause of delay on commercial solar projects anywhere in the UK. Starting early is the only real lever.

• Why this matters now

You don't set your electricity price. With solar on the roof, you do.

Every contract renewal is a negotiation you can’t really win. Your rate is decided by wholesale markets, network charges and levies, none of which you control, and the only variable you get to choose is how long you fix for. Generating on site changes that relationship. The electricity your own roof produces has a price agreed in advance, and it doesn’t move because a gas market did.

£0

Capital outlay on a PPA. The funder pays for the system in full and carries the performance risk.

2–7 yrs

Typical hire purchase term, after which the generation is effectively free for two more decades.

25 %

Corporation tax relief on the full system cost in year one, if you own the asset.

• Ways to pay

Three routes to the same roof

The survey, the design, the panels and the engineers are identical whichever route you take. What changes is who owns the asset, who carries the cost, and where the tax relief lands. Two of the three need no capital at all.
Nothing to pay up front

Power Purchase Agreement

You want the savings and the price certainty without owning anything or approving any capital.

  • A funding partner pays for, owns, insures and maintains the whole system
  • You buy the electricity it generates at a fixed pence-per-kWh rate, well below grid
  • Bills fall in the first billing period, with no capital case to write
  • Rate agreed for the term and indexed at a small fixed percentage
  • Sits off balance sheet as a supply contract rather than a lease
  • At the end of the term the asset can be purchased at a nominal fee
£0
Upfront
25 yrs
Term
Funder
Maintains
How a PPA works
No capital outlay

Hire purchase

You want to own the system and use the tax relief, but not take the cost out of working capital in one hit.

  • Little or no deposit: often just one or two payments in advance
  • Fixed monthly instalments over two to seven years
  • Structured so bill savings and export income exceed the repayment from month one
  • HMRC treats it as an outright purchase, so the AIA stays with you
  • After the term, generation is effectively free for the rest of the panels' life
£0
Deposit
2–7 yrs
Term
Yours
Tax relief
How hire purchase works
Lowest lifetime cost

Outright purchase

You have capital sitting idle and want the best return of the three over twenty-five years.

  • No cost of credit, so every generated unit is worth its full value to you
  • Annual Investment Allowance relief on the full cost in year one
  • Shortest payback of the three routes
  • All Smart Export Guarantee income is yours
  • Maintenance sits with you, or with us under a service contract
Best
Return
Day 1
Ownership
Yours
Export
How outright purchase works
Comparison of commercial solar funding routes
 Power Purchase AgreementHire purchaseOutright purchase
Upfront costNoneNil to small depositFull system cost
Who owns the systemThe funder, for the termYou: title passes at the endYou, from day one
Who maintains itThe funder, includedYou, or Smartec under contractYou, or Smartec under contract
Capital allowancesClaimed by the funderYours: treated as an outright purchaseYours
Export income (SEG)Kept by the funderYoursYours
Balance sheetOff: it's a supply contractOn: asset and liability recognisedOn: asset only
Effect on year-one cashPositive immediatelyPositive if structured wellNegative until payback
Typical term15 to 25 years2 to 7 yearsN/A: asset life 25 years+
Lifetime savingGood, with no risk exposureHigh once the term endsHighest
Suits you ifCapital is hard to get and you want zero involvementYou're profitable and want ownership on a monthly budgetYou have cash and a long tenure in the building

• Route 01 in detail

The Power Purchase Agreement

The route most businesses ask about and the one most often misunderstood. In plain terms: somebody else buys the solar system, puts it on your roof, and sells you the electricity it makes at a price you agree in advance.

We survey the site and design the system

Roof condition, structural capacity, half-hourly consumption and grid connection all get assessed before anything is proposed. The system is sized against what you actually use, because on a PPA the units you don't consume are worth far less.

We survey the site and design the system

Roof condition, structural capacity, half-hourly consumption and grid connection all get assessed before anything is proposed. The system is sized against what you actually use, because on a PPA the units you don't consume are worth far less.

A funding partner buys it outright

We take your site to funders and bring the offers back to you. The funder pays for the equipment and the installation in full. Nothing appears in your capital budget and nothing goes on your balance sheet.

You buy the electricity it generates

You sign an agreement to buy the power produced on your roof at a fixed pence-per-kWh rate below your grid import price. Most agreements index that rate by a small fixed percentage a year, so you know your price in year twelve on the day you sign.

The funder keeps it running for the term

Insurance, monitoring, servicing, inverter replacement and repairs all sit with the asset owner for the length of the agreement. We manage the works, so you deal with us rather than chasing the funder.

A PPA is usually the right call when

  • Capital expenditure is difficult to approve, or is already committed elsewhere
  • You have a long lease or freehold and heavy daytime electricity consumption
  • Price certainty matters more to you than owning another asset
  • You want the net zero and ESG reporting benefit without taking project risk
  • Your business pays little corporation tax, so the allowances would be wasted on you anyway
  • Your roof is structurally sound with fifteen or more years of life left

Funder appetite depends on covenant strength, site tenure and system size, and most funders look for sites consuming upwards of 250,000 kWh a year. We confirm what's realistic before anyone spends time on paperwork.

Where the saving comes from

Your grid import rate25p
Your PPA rate for solar15p
10p
saved on every unit your building draws from its own roof

Illustrative rates for a 200 kWp rooftop system. On around 150,000 kWh consumed on site, that gap is roughly £15,000 in year one: and it usually widens, because the PPA rate is indexed at a fixed percentage while grid prices are not. Actual rates depend on site, size, funder and covenant strength.

Illustrative project

200 kWp on a distribution unit, PPA funded

A worked example to show the shape of the numbers. Yours will differ.

200 kWp
System size
£0
Your capital outlay
180k
kWh generated a year
£15k
Year-one bill saving
System cost, funded by the partner~£150,000
Used on site~150,000 kWh
Grid rate vs PPA rate25p vs 15p
Year-one bill saving~£15,000

Illustrative only, not a quotation. Assumes a UK rooftop installation at typical yield with no shading or structural constraints.

• Route 01 in detail

Hire purchase: own it, and keep the tax relief

The route most profitable UK businesses land on. You put in little or nothing, pay fixed monthly instalments, and own the system at the end. The part people miss is that HMRC treats it as an outright purchase from day one, which is what makes it worth considerably more than a PPA to a company with taxable profits.

Illustrative project

The same 200 kWp system, on hire purchase

Same roof, same panels, different funding. This is why the route is worth a look.

+£6.5k
Net position, year one
£37.5k
Corporation tax saved
~£44k
Year-one benefit, all in
6 yrs
Then it's yours
System cost, excluding VAT£150,000
DepositOne monthly payment in advance
Indicative monthly repayment~£2,460
Total repayable over the term~£177,000 (cost of credit ~£27,000)
Annual bill saving plus export income~£36,000 (~£3,000 a month)
Capital allowances claimed, year one£150,000 in full, inside the £1m AIA limit
Year-one benefit, all in~£44,000

Illustrative only, not a quotation or an offer of finance. The system earns and saves around £3,000 a month while the repayment is around £2,460, so the project is cash-flow positive from month one before any tax is counted. On top of that, the full cost is claimed as a special-rate capital allowance in the year the system is switched on. Rates, terms and lender appetite vary; tax treatment depends on your circumstances and we confirm it with your accountant before anything is signed.

At a glance

Typical term
Two to seven years
Deposit
Nil to 20%: often just one or two payments in advance
Project value
Around £30,000 upwards
Ownership
Yours in substance from day one; title transfers at the end for a nominal fee
Capital allowances
You claim them: the transaction is treated as a cash purchase
Export income
Smart Export Guarantee payments are yours
Balance sheet
On: the asset and the outstanding liability are both recognised
VAT
Payable up front on the equipment and reclaimable as normal; the interest element is exempt
Best for
Profitable businesses that want to own the system and can use the relief

Why the tax relief stays with you

  • Acquire plant and machinery on hire purchase and HMRC treats it as though you had bought it outright for cash
  • The claim is on the full capital cost of equipment and installation, not apportioned across the instalments
  • Relief falls in the accounting period the expenditure is incurred: commission the array in March and the whole claim normally lands in that period, even with years of payments left to run
  • The interest is handled separately as an ordinary business expense against profits, rather than through the capital allowances pool

Under a PPA the funder owns the system and banks that relief instead. Under a finance or operating lease the lessor usually claims it and is expected to price the benefit back through lower rentals. If you can use the relief yourself, keeping it is almost always worth more than having somebody discount it back to you second-hand.

One point that's routinely got wrong

Solar PV is special-rate expenditure, which puts it on the Annual Investment Allowance route. It does not qualify for 100% full expensing, which covers main-rate plant only.

If a competing quote is built on full expensing for a rooftop array, the classification is wrong and so is the payback figure attached to it. Worth checking before you compare proposals side by side.

When hire purchase is not the right answer

If your business pays little or no corporation tax: a charity, a not-for-profit, a public body, or a company still carrying losses: then the biggest single advantage of hire purchase is worth nothing to you, and you'd be paying interest to own an asset whose tax value you can't use.

In that situation the funder is usually the better home for the allowances, and a PPA or a lease will normally beat hire purchase on lifetime cost. Model the routes against each other rather than taking the ownership route by default because it's the familiar one.

• Route 03 in detail

Outright purchase

If the cash is available and you’re staying in the building, buying the system outright returns more than anything else over twenty-five years. There’s no cost of credit, every generated unit is worth its full value to you, and the Annual Investment Allowance takes roughly a quarter off the effective price in year one.

It’s the benchmark every financed route gets measured against. We show you this number alongside the others even when we expect you to choose differently, because you can’t judge the cost of finance without it.

Worth doing if

  • You have capital with no better return available elsewhere in the business
  • You're profitable enough to absorb the full allowance in the year of spend
  • You own the freehold, or hold a lease long enough to see the payback through
  • You'd rather hold an appreciating asset than a long-term supply contract

Spend more than £1m on qualifying plant in a year and the AIA covers the first £1m, with the balance attracting a 50% first-year allowance and the remainder entering the special rate pool. Worth planning the timing of a large project around your year end.

• Scope of works

Everything between the enquiry and the first generated unit

Feasibility, design, grid applications, installation and aftercare are all managed by us from a single point of contact, whichever way the project is funded.

Feasibility and yield modelling

Half-hourly consumption analysis, shading study and generation forecast, so the system is sized to what you actually use rather than to what fits on the roof.

Structural assessment

Roof condition, remaining life and load capacity checked before the design is finalised. If the roof needs work first, we’ll tell you at survey stage.

Funding and finance structuring

We take the project to PPA funders and asset finance lenders, then bring the offers back costed side by side with the cost of credit shown in writing.

DNO and grid applications

G98 and G99 submissions, network operator liaison and export limitation where needed: managed early so approval doesn’t stall the project.

Installation and commissioning

Installation to BS 7671 by qualified engineers, scheduled around your operations and out of hours where the site demands it.

Monitoring and maintenance

Live generation data with fault alerts, plus panel cleaning, inverter servicing and electrical testing under a bespoke O&M package.

• What happens next

From enquiry to energised

Most commercial projects run to roughly this shape. You’ll get dated milestones once the survey is done.

Within 2 days

Desktop review

Send a bill and your address. We model the roof from aerial data and come back with an indicative size and saving.

Week 1–2

Site survey

Structural, electrical and access assessment on site, plus a look at your distribution board and metering.

Week 2–4

Proposal and funding

A designed system with all three funding routes costed side by side, so the decision is a comparison rather than a leap.

Week 4–12

Approvals

DNO application, finance or PPA documentation, planning where required, and scheduling around your calendar.

2–6 weeks on site

Install and energise

Installation, testing, commissioning and handover, then monitoring goes live and the savings start.

Where commercial solar works hardest in Kent

Large roofs and heavy daytime consumption are the two things that make the numbers work: and heavy daytime consumption is exactly what a PPA funder looks for. These sectors tend to have both.

Logistics along the M20 and M2

Distribution property between Dartford and Ashford is the strongest commercial solar stock in the county. Large modern roofs, long tenure, and materials handling equipment drawing power through the working day.

Cold storage and food production

Refrigeration runs continuously and peaks in summer, exactly when a roof generates most. Packhouses and cold stores around Ashford, Sittingbourne and Thanet regularly model the shortest paybacks we see anywhere.

Agriculture and horticulture

Glasshouses, grading sheds and irrigation pumping, with the advantage that many Kent holdings own their buildings outright and have long tenure, which opens every funding route including a PPA.

Manufacturing around Aylesford and Medway

Established industrial stock with heavy daytime load. Older buildings need a structural assessment early, because roof condition rather than economics is usually what decides these projects.

Kent public sector and education

County council estate, academies and further education sites, where capital is normally the obstacle and the funded routes are worth examining before anything else.

• Credentials

New division, a decade of delivery behind it

Smartec Energy is the energy arm of the Smartec Group, which has spent over a decade delivering large-scale building services projects for commercial, industrial and public sector clients. The division is new; the project management, the delivery processes, the supply chain and the financial backing behind it are not. We work nationwide.

Questions we get asked before
anyone signs anything

There’s no catch, but there is a trade. You pay nothing to have the system installed and nothing to maintain it, and your rate for the solar electricity is below your grid import price from day one. In exchange, the funder owns the asset, claims the capital allowances, keeps the export income, and takes the margin between the generation cost and what you pay for the length of the agreement.

Over twenty-five years you’ll save less than you would by buying the system outright. What you’re buying is certainty and the absence of a capital request.

Because the payments are designed to be smaller than the savings. On a well-structured deal the electricity you stop buying, plus the export income from what you don’t use, comes to more than the monthly instalment: so the project pays for itself out of your existing energy budget rather than out of new money.

The deposit is typically nil or one or two payments in advance. In practice you’re swapping a variable energy bill for a fixed repayment that ends after a few years, while the panels keep generating for another two decades.

In practice it becomes a requirement anyway: insurers, auditors, funders, managing agents and incoming tenants will all ask for a current report.

Three questions decide it. Do you want to own the asset? Can your business use the capital allowances? And do you have capital available, or is that the blocker?

If you’re profitable and want ownership, hire purchase is usually the answer. If capital approval is the obstacle and you’d rather not own anything, a PPA is. If you have cash sitting idle and a long tenure in the building, buy it outright. We model all three from your numbers and show you the comparison rather than steering you.

Hire purchase and outright purchase work from around £30,000 upwards, which is roughly a 40 kWp system. PPAs need to be bigger: most funders want a site consuming upwards of 250,000 kWh a year, because they’re taking a twenty-five year position and need the volume to make it work.

Roof area is only half of it. A large roof on a building that draws most of its power overnight will return far less than a smaller roof on a site running machinery all day.

Everything else is quoted, prioritised and scheduled with you. Once the remedials are complete the report can be reissued as satisfactory.

Often yes, but the remaining term matters. PPAs generally need fifteen or more years of tenure, so a short lease usually rules that route out. Hire purchase or outright purchase can still work on a shorter lease if the payback lands comfortably inside your term, and you’ll need your landlord’s consent either way.

We also work with commercial landlords who want to install and pass a reduced rate to their tenants: that arrangement is itself a PPA, just from the other side of the table.

The AIA lets most businesses deduct the full cost of qualifying plant and machinery against taxable profits in the year the expenditure is incurred, up to £1m a year. At the 25% main rate of corporation tax, a £150,000 system reduces your tax bill by around £37,500, bringing the effective cost down to roughly £112,500 and shortening payback accordingly.

It’s available on outright purchase and on hire purchase, because HMRC treats hire purchase as a cash purchase. It isn’t available on a PPA, where the funder claims it instead. Above the £1m limit, special-rate spend attracts a 50% first-year allowance with the balance entering the special rate pool. Allowances and thresholds change: confirm the position with your accountant.

Yes. You can request a settlement figure at any point and clear the balance ahead of schedule, which is useful if you come into cash, refinance, or sell the business. The figure is broadly the outstanding capital plus interest accrued to that date, so settling early usually saves you the interest that hasn’t yet fallen due rather than triggering a penalty.

Exactly how the rebate is calculated depends on the agreement, so ask for the figure in writing before deciding, and check whether the small option-to-purchase fee is still payable to transfer title.

The IET Code of Practice sets out a risk-based approach instead, which is why a drill on a construction site is inspected far more often than a monitor in an office. Blanket annual testing of everything is usually money wasted.

The panels are fixed to the roof, so they normally transfer with the property. A hire purchase agreement belongs to your company rather than the building, so it doesn’t disappear on completion: you either settle the outstanding balance out of the sale proceeds, or arrange for the buyer to take over the agreement with the lender’s consent.

A PPA transfers with the site and the incoming owner steps into it, which is worth disclosing early in a sale. In practice a system that’s already cheap to run and generating reads as an asset to a buyer, not a liability.

Rooftop work is largely invisible from inside the building. The disruptive parts are the electrical tie-in at your distribution board, which usually needs a short planned shutdown, and any scaffolding or crane access. Both get scheduled around you, including out of hours or over a weekend where the site demands it.

This is exactly why we assess roof condition before design. Panels have a twenty-five year life, so a roof with less than fifteen years left is a genuine problem: removing and refitting an array is expensive, and a PPA funder won’t take the position at all.

If the roof is nearing end of life we’ll tell you at survey stage. In some cases overcladding, or a roof replacement combined with the solar install, is the better project and we’ll cost it that way.

Yes, and we usually recommend that order. Install solar first, monitor a full year of real generation and consumption data, then size storage against what you actually export rather than against a forecast. We design the electrical infrastructure with that expansion in mind so the later work is straightforward.

Yes. G98 applications for smaller systems and G99 for larger ones are submitted and managed by us. It’s one of the most common causes of delay on commercial solar projects, so we start it early.

Our head office is in Maidstone, so most Kent surveys are arranged within a few days rather than a few weeks. Desktop feasibility comes back within two working days from your address and a recent bill, before anyone travels to site.

Find out what your Kent roof is worth

Send a recent electricity bill and your postcode. Two working days later you will have an indicative system size, a generation forecast and all three funding routes costed side by side.

No obligation, and no site visit needed to get started.

Scroll to Top